« Reply #17 on: January 11 2025, 05:03:20 PM »
Goes into paint monday, scheduled to bring home to re assemble on 1-20....that gives me 2 weeks to get it done. Very excited.
Logged
87 GN, K&N cold air, gutted cat, TT 5.7 chip, AFPR, 340 Walbro w/ hotwire, 60 LBS injectors, 981 valve springs, 206/206 Cam, RJC Powerplate, LS1 MAF & translator, Vacuum brakes, Hellwig rear sway bar, Energy suspension poly bushings, Razors Alky, Pypes exhaust, 5931 turbo, CK9.5 converter